Construction Operations OS

Every commitment, cited and reversible.

One control room for the schedule, the field, and the project documents — powered by native deterministic intelligence.

Weekly Work Plan

Week of Jul 13 - Harborview Residences

Live

Health

82

PPC

75%

Open risk

1

-2d variance

  • TE

    Rough electrical wiring - Level 2

    Tom Electric

    On track
  • SP

    Pass plumbing pressure test

    Sara Plumbing

    At risk
  • JG

    Install corridor embeds

    Jane GC

    Committed
2 Agent proposals open for review

4

roles with a purpose-built view: PM, scheduler, superintendent, trade partner

100%

self-hosted & open: zero paid commercial vendor lock-in

1

plan, from the master schedule to the weekly commitment

0

writes without your confirmation

The operating rhythm

The schedule becomes how the project runs.

The master schedule does not stop at the update meeting. InfraTrack keeps it live between the office, the field, and the next decision.

01

Build the master plan

Create activities, connect dependencies, protect milestones, and expose the critical path.

Contract schedule

02

Make it field-ready

Pull upcoming work into a rolling lookahead and sequence it with the people doing the work.

2-6 week lookahead

03

Run the week

Capture trade commitments, completion, and reasons for variance while they are still actionable.

Weekly commitments

04

Learn and adjust

Feed actual progress, roadblocks, PPC, and schedule impact back into the next planning cycle.

Performance intelligence

Live project pulse

82Healthy

Composite health across schedule, PPC, variance, and roadblocks.

68%

Complete

75%

PPC

1

Open risk

-2d

Variance

Cited and reversible

From project risk to a confirmed action.

The Agent reads the live schedule, commitments, and uploaded documents. Every proposed change is cited where possible, reviewable before it applies, and written only after explicit confirmation.

  1. 01

    Risk detected

    A slip, roadblock, or open control item appears on the live plan.

  2. 02

    Agent reads

    Live tasks, commitments, and uploaded project documents are queried in context.

  3. 03

    Exact-page cite

    Sources show the file, page number, and excerpt when documents back the answer.

  4. 04

    Proposal ready

    Changes, warnings, and expected impact are shown, still no write.

  5. 05

    Human confirms

    Explicit approval only. Permissions and stale snapshots are rechecked.

  6. 06

    Logged result

    The schedule, RFI, or commitment updates atomically and lands in the activity log.

Permission recheckStale-data protectionAtomic applyActivity history

Agent

Every proposal shows its source before it shows a button to confirm.

A proposal card carries the source excerpt, the change, the expected impact, and the confirm step the Agent always requires.

InfraTrack Agent

Harborview Residences - Building A

Live data
Raise an RFI about panel clearance for Electrical panel inspection, citing the architectural plans.

Action proposal

Pending confirmation

Raise RFI - panel clearance

Confirm required working clearances at the main electrical panel before re-inspection. Linked to Electrical panel inspection.

Source

A000 NIST NZERTF Architectural Plans.pdf - page 1

“Confirm required working clearances at main distribution panel.”

Change
Create open RFI
Impact
Unblocks inspection path
Confirm changeCancel

No write yet. Confirm rechecks permissions and stale data, then logs the action.

The connected project system

One plan from baseline to field execution.

InfraTrack links schedule logic, short-interval planning, weekly commitments, project controls, and portfolio visibility. Every team works from the same live project truth.

Riverside Apartments - Phase 1

JGMSSP

Master Schedule

5 activities · 1 critical path risk

Activity / responsibleDates

Site prep & excavation

Jane GC

Jul 05 - Jul 10

Rough electrical wiring

Tom Electric

Jul 12 - Jul 20

Rough plumbing install

Sara Plumbing

Jul 16 - Jul 26

Electrical inspection

Tom Electric

Jul 21 - Jul 22

Drywall installation

Unassigned

Jul 27 - Aug 04

Jul 05Jul 12Jul 19Jul 26Aug 02

01

Schedule logic stays connected

Dependencies, dates, critical path, and field updates move together.

02

Commitments become measurable

Weekly promises produce PPC and variance signals automatically.

03

Risk reaches the right level

Roadblocks and constraints roll into portfolio health without report chasing.

Built around the team

The right view for every person on the project.

InfraTrack keeps one connected data model underneath purpose-built workflows. Everyone sees what they need, and the project keeps one version of the truth.

01

Project Managers

Control the whole project without building another report.

  • Schedule health
  • Risk ownership
  • Project controls
02

Schedulers

Protect schedule logic while the project moves in real time.

  • Critical path
  • Dependencies
  • Baselines + variance
03

Superintendents

Turn the contract plan into executable work for the field.

  • Lookaheads
  • Pull planning
  • Constraint removal
04

Trade Partners

Commit, update, and raise issues without learning scheduling software.

  • My work
  • Weekly promises
  • Field updates

Integrations

Keep the systems of record. Add the schedule context.

InfraTrack connects to the document and project systems teams already use, so drawings and field records stay linked to the plan they affect.

Python Hybrid Retrieval Engine (BM25 + FAISS)

Domain-specific microservice executing lexical search, dense vector retrieval, and an 8-signal contextual reranker for real-time progress linking.

Self-Hosted & Active (Port 8000)

Document OCR Engine (OCRmyPDF)

Self-hosted worker extracting searchable text and engineering observations from scanned PDFs, daily progress notes, and jobsite drawings.

Self-Hosted & Active (Port 8010)

Start with the next project

Put the schedule where the work actually happens.

Create a connected project workspace, bring in the team, and turn the next schedule update into a shared operating plan.