Build the master plan
Create activities, connect dependencies, protect milestones, and expose the critical path.
Contract schedule
One control room for the schedule, the field, and the project documents — powered by native deterministic intelligence.
Weekly Work Plan
Week of Jul 13 - Harborview Residences
Health
PPC
75%
Open risk
1
-2d variance
Rough electrical wiring - Level 2
Tom Electric
Pass plumbing pressure test
Sara Plumbing
Install corridor embeds
Jane GC
4
roles with a purpose-built view: PM, scheduler, superintendent, trade partner
100%
self-hosted & open: zero paid commercial vendor lock-in
1
plan, from the master schedule to the weekly commitment
0
writes without your confirmation
The operating rhythm
The master schedule does not stop at the update meeting. InfraTrack keeps it live between the office, the field, and the next decision.
Create activities, connect dependencies, protect milestones, and expose the critical path.
Contract schedule
Pull upcoming work into a rolling lookahead and sequence it with the people doing the work.
2-6 week lookahead
Capture trade commitments, completion, and reasons for variance while they are still actionable.
Weekly commitments
Feed actual progress, roadblocks, PPC, and schedule impact back into the next planning cycle.
Performance intelligence
Live project pulse
Composite health across schedule, PPC, variance, and roadblocks.
68%
Complete
75%
PPC
1
Open risk
-2d
Variance
Cited and reversible
The Agent reads the live schedule, commitments, and uploaded documents. Every proposed change is cited where possible, reviewable before it applies, and written only after explicit confirmation.
01
A slip, roadblock, or open control item appears on the live plan.
02
Live tasks, commitments, and uploaded project documents are queried in context.
03
Sources show the file, page number, and excerpt when documents back the answer.
04
Changes, warnings, and expected impact are shown, still no write.
05
Explicit approval only. Permissions and stale snapshots are rechecked.
06
The schedule, RFI, or commitment updates atomically and lands in the activity log.
Agent
A proposal card carries the source excerpt, the change, the expected impact, and the confirm step the Agent always requires.
InfraTrack Agent
Harborview Residences - Building A
Action proposal
Pending confirmationRaise RFI - panel clearance
Confirm required working clearances at the main electrical panel before re-inspection. Linked to Electrical panel inspection.
Source
A000 NIST NZERTF Architectural Plans.pdf - page 1
“Confirm required working clearances at main distribution panel.”
No write yet. Confirm rechecks permissions and stale data, then logs the action.
The connected project system
InfraTrack links schedule logic, short-interval planning, weekly commitments, project controls, and portfolio visibility. Every team works from the same live project truth.
Riverside Apartments - Phase 1
Live project workspace
Master Schedule
5 activities · 1 critical path risk
Site prep & excavation
Jane GC
Jul 05 - Jul 10
Rough electrical wiring
Tom Electric
Jul 12 - Jul 20
Rough plumbing install
Sara Plumbing
Jul 16 - Jul 26
Electrical inspection
Tom Electric
Jul 21 - Jul 22
Drywall installation
Unassigned
Jul 27 - Aug 04
01
Dependencies, dates, critical path, and field updates move together.
02
Weekly promises produce PPC and variance signals automatically.
03
Roadblocks and constraints roll into portfolio health without report chasing.
Built around the team
InfraTrack keeps one connected data model underneath purpose-built workflows. Everyone sees what they need, and the project keeps one version of the truth.
Control the whole project without building another report.
Protect schedule logic while the project moves in real time.
Turn the contract plan into executable work for the field.
Commit, update, and raise issues without learning scheduling software.
Integrations
InfraTrack connects to the document and project systems teams already use, so drawings and field records stay linked to the plan they affect.
Domain-specific microservice executing lexical search, dense vector retrieval, and an 8-signal contextual reranker for real-time progress linking.
Self-Hosted & Active (Port 8000)
Self-hosted worker extracting searchable text and engineering observations from scanned PDFs, daily progress notes, and jobsite drawings.
Self-Hosted & Active (Port 8010)
Start with the next project
Create a connected project workspace, bring in the team, and turn the next schedule update into a shared operating plan.